For a new house on PEI, a licensed site assessor or an engineer first tests the soil and files a site suitability assessment with the province. A licensed septic contractor then works out the system's specifications, registers the system, installs it and certifies the work to the owner and the province. The rules, including the minimum distances between the tank, the disposal field, the well and the property lines, are in the Sewage Disposal Systems Regulations under PEI's Water Act.
When does a new house need a site suitability assessment?
Whenever the lot will have a septic system. The province's development permit guide says a site suitability assessment is needed to develop a lot or to install or replace a septic system, and it is done by a qualified site assessor or a consulting engineer. The province still handles the septic system and the assessment even inside towns that issue their own development permits.
The regulations allow three kinds of people to do the assessment: an engineer, a provincial environment officer, or someone holding a valid site assessor's licence. The registration form they file records the lot's category and the depth of permeable soil on the site. For a new subdivision, the province's 2024 Coastal Property Guide says a licensed site assessor can assess fewer than six lots, while six or more need a consulting engineer who specialises in on-site sewage systems.
What do the lot categories mean for a septic system?
The category describes how much good soil sits above bedrock and groundwater, and, for lots in a new subdivision, it sets the minimum lot size. The Planning Act's Subdivision and Development Regulations sort lots into Categories I to V by the depth of permeable soil, the depth to bedrock and the depth to the highest groundwater level. Category I, the best, has at least 2 feet (0.61 metres) of permeable soil, with bedrock and groundwater 4 feet (1.22 metres) down or deeper. Category V has bedrock less than 1 foot (0.3 metres) below the surface, and the table lists it as not developable with its own well and septic.
For a lot in a new subdivision with its own well and septic and one house, Category I needs at least 25,000 square feet (2,322.5 square metres), large enough to hold a 150-foot (45.7-metre) circle, and 100 feet (30.5 metres) of frontage. The other categories have their own minimums in the same table.
The soil matters because on a Category I, II or III lot the disposal field needs at least 600 millimetres (2 feet) between the bottom of its trenches and bedrock, the highest water table, or soil that drains too fast. Where a site falls short, the provincial standards allow good-quality fill to make up the separation.
Who is allowed to install a septic system on PEI?
Only a licensed septic contractor may install, rebuild, modify or decommission one. A registered installer can work for the contractor, but the contractor or an installer the contractor employs has to be on site while the system goes in. To hold the licence, a contractor completes a seminar and an exam and generally also holds a site assessor's licence.
The regulations make the septic contractor responsible for meeting the provincial standards on any system the contractor installs. An engineer has to design a system that handles more than 6,810 litres per day, which is well above the design flow of 1,400 litres per day that the standards set for a three-bedroom house with standard toilets.
What gets filed with the province, and when?
Two registration forms, a notice and a certificate, in this order:
- Site suitability assessment registration, filed by the assessor or engineer when the assessment is finished.
- Sewage disposal system registration, filed by the septic contractor once the system's specifications are worked out under the provincial standards.
- Notice of installation, given to the province at least 24 hours before work starts. The contractor cannot begin until the assessment is done and both forms are in.
- Certificate of compliance, which the contractor gives to the owner and the province within 60 days of installing, confirming the system matches its registration and the regulations.
Winter can affect timing too, since the province can order a stop to installations when weather or ground conditions are unsuitable.
How big does the septic tank have to be?
At least 3,400 litres for a house with up to three bedrooms, under the provincial standards. Larger houses need more:
| Bedrooms | Minimum tank liquid capacity |
|---|---|
| Up to 3 | 3,400 litres |
| 4 | 4,090 litres |
| 5 | 4,500 litres |
A house with a garbage grinder needs 25 percent more capacity. The tank has to be watertight and certified to the CSA B66 standard, with a riser at the outlet, an effluent filter and a lid labelled "DANGER - DO NOT ENTER".
What kinds of disposal field are used?
The standards name four kinds: the multiple trench, the alternative multiple trench, the gravelless disposal system and the contour trench, which comes in several versions (C1, raised C1, C2 and C3). The site assessor, contractor or engineer picks the type to suit the site: a contour trench, for example, is used on a slope of at least 5 percent, and gravelless systems suit places where gravel is hard to get. A disposal field is not allowed where the highest water table comes within 0.6 metres of the surface, under a roadway, driveway or paved area, or in an area that can flood. Holding tanks are reserved for cases where the province finds no practical alternative, so they are not a normal choice for a new house.
How far does the septic system have to be from the well, the house and the water?
Both the tank and the disposal field have to be at least 15.2 metres (50 feet) from a well, and the standards set five other distances:
| Distance from | Septic tank | Disposal field |
|---|---|---|
| A water well | 15.2 m (50 ft) | 15.2 m (50 ft) |
| A property boundary | 3.0 m (10 ft) | 3.0 m (10 ft) |
| A building with a foundation | 4.6 m (15 ft) | 6.1 m (20 ft) |
| A beach | 22.9 m (75 ft) | 22.9 m (75 ft) |
| The natural boundary of a body of water | 15.2 m (50 ft) | 15.2 m (50 ft) |
| A water line | 3.0 m (10 ft) | 3.0 m (10 ft) |
Table C1 of the Sewage Disposal Systems Regulations sets these distances, and it carries two footnotes: lots that existed before 1993 have a different beach rule, and variances may be given for slab-on-grade or walkout basements in tight situations. Ask the licensed contractor to confirm the distances for the lot. The sewer line from the house to the tank has to be at least 3 metres from a well. The well rules apply the same distances from the other side: a well cannot be drilled within 15 metres of a septic tank or disposal field. On a coastal lot, the Coastal Property Guide adds that the beach distance becomes 60 times the annual erosion rate wherever that is greater.
How often should a septic tank be pumped?
The province's homeowner's guide says "the average septic tank should be pumped once every three years," depending on use: heavily used tanks may need it more often and some less often. That guide dates from 2013, so treat the interval as a rule of thumb, not a requirement. Under the regulations, only a licensed pumper may clean out a system.
The same guide gives four more care points:
- At a seasonal cottage, don't pump the tank just before winter, because an empty tank can be damaged by frost.
- Keep cars, trucks and heavy equipment off the disposal field, and large trees away from it, with sod over it.
- Skip tank additives.
- Roof, foundation, sump and basement drain water stays out of the system.
The regulations' own standards add that backwash from a water-treatment unit should go into the system only if it was designed for it.
Septic design shapes where the house, well and driveway can go, so it belongs early in planning a build. GI Adams Construction builds custom homes, cottages and additions on Prince Edward Island, from Tignish to Cornwall. Read about custom home builds and request a free quote.